2008年12月21日 #

Scheduling is always carried out for all scheduling levels that you have specified, therefore it is recommended that you only maintain levels relevant to scheduling.

Whereas you can choose between several scheduling types for detailed scheduling, rough-cut and production-rate scheduling always use backwardscheduling. Reductions are also only relevant for detailed scheduling.

Step1:  Production--->Shop Floor Control--->Operations--->Scheduling
            --->Define Scheduling Parameters for Production Orders
          

Step2:  New entries
          

Step3:  input parameters and save it
          

Step4:  completed
          

posted @ 2008-12-21 17:28 Burgess 阅读(610) | 评论 (0)编辑 收藏

You can assign a control profile to each production scheduler.By assigning production schedulers to materials within the application, you can define responsibilities for a materials within production activity control.

Step1:  Production--->Shop Floor Control--->Master Data
            --->Define production scheduler
          

Step2:  New entries
          

Step3:  input data and save it
          

posted @ 2008-12-21 16:29 Burgess 阅读(573) | 评论 (0)编辑 收藏

You can assign a production scheduling profile to a
      material (work scheduling screen in material master)
      production scheduler (Customizing)

The assignment to the material has a higher priority.
The production scheduling profile is copied to the production order or process order on order creation.

Step1:  Production--->Shop Floor Control--->Master Data
            --->Define production scheduling profile
          

Step2:  New entries
          

Step3:  input data and save it
          

Step4:  another profile
          

posted @ 2008-12-21 12:15 Burgess 阅读(567) | 评论 (0)编辑 收藏