Scheduling is always carried out for all scheduling levels that you have specified, therefore it is recommended that you only maintain levels relevant to scheduling.
Whereas you can choose between several scheduling types for detailed scheduling, rough-cut and production-rate scheduling always use backwardscheduling. Reductions are also only relevant for detailed scheduling.
Step1: Production--->Shop Floor Control--->Operations--->Scheduling
--->Define Scheduling Parameters for Production Orders

Step2: New entries

Step3: input parameters and save it

Step4: completed