You can assign a production scheduling profile to a
      material (work scheduling screen in material master)
      production scheduler (Customizing)

The assignment to the material has a higher priority.
The production scheduling profile is copied to the production order or process order on order creation.

Step1:  Production--->Shop Floor Control--->Master Data
            --->Define production scheduling profile
          

Step2:  New entries
          

Step3:  input data and save it
          

Step4:  another profile
          