Question:
The following control parameters can be set in a long-term planning scenario : 

Answer:
 A   Planning period 
 B   Opening stock 
 C   Strategy group 
 D   MRP type 
 E   Version of available capacity 

Question:
What is the name of the planning level for the MRP run?

Answer:
A.  SOP
B.  MP
C.  MRP
D.  COPA

Question:
What are the main features of the MRP types 'PD' or 'VB'?

Answer:
A.  'PD' can only be used with 'Net Change Planning'
B.  'VM' can only be used in total planning
C.  'PD' triggers a BOM explosion
D.  'VM' can use the forecast for the calculation of the safety stock

Question:
What is the meaning of the planning time fence?

Answer:
A.  It determines the planning period for the planning run
B.  It determines the period in which the planned orders are to be converted into production orders
C.  It determines the period in which no automatic changes are to be made to the production plan

Question:
In forecast-based planning, which forecast model does SAP support?

Answer:
A.  dynamic model
B.  seasonal trend model
C.  split trend model
D.  Consumption model

Question:
What conditions must be fulfilled in Customizing if a production order is to be checked for availability?

Answer:
A.  Scope of check
B.  Checking group 
C.  checking rule
D.  Checking assignment
E.   Inspection period